GE MIVII1000E00HI00

Manufacturer: ABB

Model: MIVII1000E00HI00

Weight: 1Kg

Shipping weight: 2Kg

Quantity: 15

Warranty period: from 1 year

Imported: Yes

Available for sale: worldwide

Category:
Email: Jiedong@sxrszdh.com
Phone: +86 15340683922
Sales:Wu Jiedong
All prices listed on the official website are subject to confirmation by contact: Wu Jiedong (manager).
Our product: brand new original packaging
Our payment: 100% telegraphic transfer of inventory items before shipment, conditions can be proposed!
If you have any downtime spare parts that you cannot find, please feel free to call or use email to contact me. If there are issues that the product cannot solve, please contact me. Product prices can be negotiated. Please do not consider contacting me!

Description

GE MIVII1000E00HI00

[Product features]

Estimated lead time: 1-3 days

① Brand: GE

② Model: MIVII1000E00HI00

③ Product category: module

④ Payment method: T/T, USD, Western Union

⑤ Freight: The freight in different regions shall be borne by the local freight forwarder.

⑥ Does it include tariffs? It does not include any taxes.

⑦ Packaging: use the Seller’s safe packaging.

MIVII1000E00HI00

DISCONTINUED BY MANUFACTURER

RELAY

PLC works in the way of “sequential scanning and continuous circulation”. That is, when the PLC is running, the CPU compiles the program in the user’s memory according to the user’s control requirements, and performs periodic cyclic scanning according to the instruction step number (or address number). If there is no jump instruction, the user program will be executed one by one from the first instruction until the end of the program. Then return to the first command and start the next round of scanning. In the process of each scan, the sampling of input signals and the refreshing of output status should also be completed.

A scan cycle of PLC must go through three stages: input sampling, program execution and output refresh.

In the input sampling stage, PLC reads the on-off status or input data of all input terminals temporarily stored in the input latch in sequence by scanning, and writes them into the corresponding input status registers, that is, refreshes the input. Then close the input port and enter the program execution phase.

At the program execution stage, PLC scans and executes each instruction according to the sequence in which the user program instructions are stored. After corresponding calculation and processing, the results are written into the output status register. All contents in the output status register change with the program execution.

Output refresh stage: when all instructions are executed, the on-off state of the output status register is sent to the output latch in the output refresh stage, and output by certain means (relay, transistor or thyristor) to drive the corresponding output device to work.
5ab242b911f192e25bab 8 GE MIVII1000E00HI00

3e205b8aabad9c9a51db 14 GE MIVII1000E00HI00

8409eb9e4800d26cc616 4 GE MIVII1000E00HI00

353f0445c15572a52b0d 3 GE MIVII1000E00HI00

26c2123bab8a672aaa51 GE MIVII1000E00HI00

Email: Jiedong@sxrszdh.com
Phone: +86 15340683922
Sales:Wu Jiedong
Our products are guaranteed for 1 year, with new and original production stopped and imported spare parts.
All prices listed on the official website are subject to confirmation by contact: Wu Jiedong (manager).
Our product: brand new original packaging
Our warranty: All new or repaired parts have a 12 month warranty period beginning
Our payment: 100% telegraphic transfer of inventory items before shipment, conditions can be proposed!
If you have any downtime spare parts that you cannot find, please feel free to call or use email to contact me. If there are issues that the product cannot solve, please contact me. Product prices can be negotiated. Please do not consider contacting me!