Description
Description: WESTINGHOUSE 1C31233G04
Imported with original packaging, competitive price, large quantity of goods in stock.
Commitment I: 1. Absolute guarantee of new and original import
Commitment 2: 2. Absolute guarantee of safe and punctual delivery
Commitment III: 3. Absolute guarantee of after-sales service quality
Process 1: 1. The customer confirms the model of the product to be purchased
Process 2: 2. We will query the price and delivery date according to the model of the inquiry sheet and draw up a detailed formal quotation
Process 3: 3. The customer orders the product after receiving the quotation and confirming that the model is correct
Process 4: 4. The person in charge of the quotation draws up a sales contract according to the model and quantity provided by the customer
Process 5: 5. After receiving the agreement of contract review, the customer will stamp and return it and remit it to the company’s account bank according to the contract sales amount
Process 6: 6. After the financial department of our company finds the payment, the salesperson arranges the delivery and notifies the customer to track the waybill
PLC is an industrial control equipment for industrial and mining enterprises. Its interface is easy, and its programming language is easy to be accepted by engineers and technicians. The graphic symbols and expressions of ladder diagram language are quite close to relay circuit diagram, which opens a convenient door for those who are not familiar with electronic circuits, computer principles and assembly language to engage in industrial control.
The system is designed with small workload, convenient maintenance and easy transformation
PLC uses storage logic instead of wiring logic, which greatly reduces the external wiring of the control equipment, greatly shortens the design and construction cycle of the control system, and makes daily maintenance easier. More importantly, it makes it possible to change the production process of the same equipment by changing the program. This is especially suitable for production occasions with multiple varieties and small batches.
Installation and wiring
● The power line, control line and PLC power line and I/O line shall be wired separately, and the isolation transformer shall be connected with PLC and I/O with double rubber wires. Separate the IO line and high-power line of PLC. If it must be in the same slot, separate the AC line and DC line. If conditions permit, the slot routing is the best, which can not only make it have the largest possible space distance, but also reduce the interference to the minimum.
● PLC shall be far away from strong interference sources such as electric welding machine, high-power silicon rectifier and large power equipment, and shall not be installed in the same switchgear with high-voltage electrical appliances. The PLC in the cabinet shall be away from the power line (the distance between the two shall be greater than 200mm). Inductive loads installed in the same cabinet with PLC, such as the coils of high-power relays and contactors, should be connected in parallel with RC arc suppression circuit.
● The input and output of PLC should be wired separately, and the switching value and analog value should also be laid separately. The transmission of analog signal shall adopt shielded wire, and the shielding layer shall be grounded at one or both ends, and the grounding resistance shall be less than 1/10 of the shielding layer resistance
All prices listed on the official website are subject to confirmation by contact: Wu Jiedong (manager).
Our product: brand new original packaging
Our warranty: All new or repaired parts have a 12 month warranty period beginning
Our payment: 100% telegraphic transfer of inventory items before shipment, conditions can be proposed!
If you have any downtime spare parts that you cannot find, please feel free to call or use email to contact me. If there are issues that the product cannot solve, please contact me. Product prices can be negotiated. Please do not consider contacting me!