PFSK151 modular

[Product features]

Estimated lead time: 1-3 days

① Brand: ABB

② Model: PFSK151

③ Product category: module

④ Payment method: T/T, USD, Western Union

⑤ Freight: The freight in different regions shall be borne by the local freight forwarder.

⑥ Does it include tariffs? It does not include any taxes.

⑦ Packaging: use the Seller’s safe packaging.

Compared with thermal automation, electrical system has many differences in control requirements and operation process. The main characteristics of electrical system are as follows:

Compared with thermal equipment, electrical equipment has few control objects and low operation frequency. When some systems or equipment operate normally, they are often operated for several months or more.

The automatic protection device of electrical equipment requires high reliability and fast action. The protection action speed of generator-transformer unit shall be within 40ms; Automatic quasi-synchronization adopts synchronous voltage mode, and speed, voltage adjustment and sliding voltage control are required to be within 5ms; The time required for fast excitation of the automatic voltage regulator is very short; The fast switching time of auxiliary power fast switching device is generally less than 60~80ms, and the phase difference of synchronous identification is 5 °~20 °.

Category:
Email: Jiedong@sxrszdh.com
Phone: +86 15340683922
Sales:Wu Jiedong
All prices listed on the official website are subject to confirmation by contact: Wu Jiedong (manager).
Our product: brand new original packaging
Our payment: 100% telegraphic transfer of inventory items before shipment, conditions can be proposed!
If you have any downtime spare parts that you cannot find, please feel free to call or use email to contact me. If there are issues that the product cannot solve, please contact me. Product prices can be negotiated. Please do not consider contacting me!

Description

[Product features]

Estimated lead time: 1-3 days

① Brand: ABB

② Model: PFSK151

③ Product category: module

④ Payment method: T/T, USD, Western Union

⑤ Freight: The freight in different regions shall be borne by the local freight forwarder.

⑥ Does it include tariffs? It does not include any taxes.

⑦ Packaging: use the Seller’s safe packaging.

Description:

Imported with original packaging, competitive price, large quantity of goods in stock.

Commitment I: 1. Absolute guarantee of new and original import

Commitment 2: 2. Absolute guarantee of safe and punctual delivery

Commitment III: 3. Absolute guarantee of after-sales service quality

Process 1: 1. The customer confirms the model of the product to be purchased

Process 2: 2. We will query the price and delivery date according to the model of the inquiry sheet and draw up a detailed formal quotation

Process 3: 3. The customer orders the product after receiving the quotation and confirming that the model is correct

Process 4: 4. The person in charge of the quotation draws up a sales contract according to the model and quantity provided by the customer

Process 5: 5. After receiving the agreement of contract review, the customer will stamp and return it and remit it to the company’s account bank according to the contract sales amount

Process 6: 6. After the financial department of our company finds the payment, the salesperson arranges the delivery and notifies the customer to track the waybill

DCS control system has been fully adopted for thermal control of 300MW and above units, and four systems have been gradually formed: data acquisition (DAS), analog control (MCS), sequence control (SCS) and burner management (BMS). From the actual operation, DCS has achieved its control function well, and has played the advantages of safety, economy and reliability, and achieved good results. However, the electrical control still uses more conventional control means, using one-to-one hard manual operation on the panel. With the rapid development of computer and the continuous improvement of control technology, the boiler control and electrical control are increasingly uncoordinated, and the control level is also gradually enlarged. In order to solve this contradiction, the effective way is to incorporate electrical control into DCS control, which not only makes use of DCS’s mature decentralized control technology, but also improves the level of electrical control. After the electrical control is incorporated into DCS, it can make full use of the means of DCS to achieve more convenient and complete electrical misoperation prevention and other functions, and organically combine the display and alarm of relevant quantities with the control and adjustment of electrical equipment, effectively improving the safety and reliability of the entire electrical control.

PFSK151

PFSK151

2ca4f3028e05eae2c20a PFSK151 modular

9655ea2d578ad10da017 PFSK151 modularCP260
3CP260.60-1
3BHE035301R1002
3BDH000741R1
PR6423/018-110
VF1406M C9
ECM-19T CXB-1
X20CP1486
3IP161.60-1
C1CPU-4S-07
WESDAC D20A/0511-01010
4PP220.0571-45
CC-PDIL51
BRC400
DSAI130
MKD090B-047-KG1-KN
A6410
PQM-T20-C

Email: Jiedong@sxrszdh.com
Phone: +86 15340683922
Sales:Wu Jiedong
Our products are guaranteed for 1 year, with new and original production stopped and imported spare parts.
All prices listed on the official website are subject to confirmation by contact: Wu Jiedong (manager).
Our product: brand new original packaging
Our warranty: All new or repaired parts have a 12 month warranty period beginning
Our payment: 100% telegraphic transfer of inventory items before shipment, conditions can be proposed!
If you have any downtime spare parts that you cannot find, please feel free to call or use email to contact me. If there are issues that the product cannot solve, please contact me. Product prices can be negotiated. Please do not consider contacting me!