Description
Product ID: 3BSE019050R1000
ABB model name: PFTL301E-1.0kN
Catalog description: PFTL 301E 1,0kN, Load cell
classification
3BSE019050R1000 – image 0
Additional information
ABB model name: PFTL301E-1.0kN
Core credit: 0.00
Origin: Sweden (SE)
Boundary dimension: Spare_ Parts
Gross weight: 5.75 kg
Invoice description: PFTL 301E 1,0kN, Load cell
Make to order: No
Media description: Load Cell, Mini-PBT
Minimum order quantity: 1 piece
Order multiple: 1 piece
Total weight of Level 1 package: 5.75 kg
Level 1 packaging unit: 1 piece
Part type: New
Product: Unclassified
Net weight of product: 5.75 kg
Product application type: Unclassified
Quote only: No
Sales measurement unit: piece
Working speed refers to the speed at which the CPU of PLC executes instructions and responds to input signals that need to be processed. Working speed is the basis of PLC work. Only when the speed is high can the control be realized through the operation program, the control scale be continuously expanded, and the various functions of PLC can be brought into play.
PFTL301E 3BSE019050R1000 1.0KN pdf
There are many instructions for PLC. Different PLC. The number of instructions is also different. There are dozens less and hundreds more. The execution time is different with different instructions. But all kinds of PLCs always have some basic instructions, and all kinds of PLCs have these basic instructions, so the speed is often measured by the time of executing a basic instruction. Of course, the shorter the time, the better. It has been shortened from microsecond to zero microsecond. And with the progress of microprocessor technology, this time is still shortening.
PFTL301E 3BSE019050R1000 1.0KN pdf
Short execution time can speed up the response speed of PLC to general input signals. From discussing the working principle of PLC, we can know that from adding input signals to PLC to generating output from PLC, the most ideal situation is to delay the cycle of PLC operation program. Because PLC monitors the input signal, the output generated after running the program is the response to the input signal. When it is not ideal, it needs to extend one more cycle. When the input signal is sent to the PLC, the PLC input refresh just ends, which is the case. At this time, it is necessary to wait one more cycle before the input mapping area of PLC can receive the new input signal. Although this delay is acceptable for general input signals, it is not acceptable for input signals that need urgent response. There shall be other requirements for how long the PLC can respond to the input signal that needs to be processed.
All prices listed on the official website are subject to confirmation by contact: Wu Jiedong (manager).
Our product: brand new original packaging
Our warranty: All new or repaired parts have a 12 month warranty period beginning
Our payment: 100% telegraphic transfer of inventory items before shipment, conditions can be proposed!
If you have any downtime spare parts that you cannot find, please feel free to call or use email to contact me. If there are issues that the product cannot solve, please contact me. Product prices can be negotiated. Please do not consider contacting me!