TRICONEX 8111 chassis can be transported to all parts of the world.
(Excluding special circumstances, the area cannot be transported!)
If necessary, please contact customer service.
[Service contact information]
① Receive email replies within 24 hours (12 hours);
② Reply at any time, please add WeChat.
③ For shipment to countries outside Asia, please contact the seller. (part of the international region, free of freight)
[Product characteristics]
① Brand: TRICONEX
② Model: 8111
③ Inventory quantity: 6
④ Color: new
⑤ Freight: according to different local freight forwarders, the freight in different regions shall prevail.
⑥ Include tariff or not: do not include any taxes
⑦ Packaging: use the Seller’s safe packaging
It is an important principle to ensure that the PLC control system can operate safely, reliably and stably for a long time. This requires the designer to fully consider the system design, component selection and software programming to ensure the safety and reliability of the control system. For example, it should be ensured that the PLC program not only operates under normal conditions, but also works normally under abnormal conditions (such as sudden power failure and power on, wrong button press, etc.).
TRICONEX 8111 chassis
Strive for simplicity, economy, convenient use and maintenance
TRICONEX 8111 chassis
A new control project can certainly improve the quality and quantity of products and bring huge economic and social benefits, but the investment of new projects, technical training and equipment maintenance will also lead to an increase in operating funds. Therefore, on the premise of meeting the control requirements, on the one hand, we should pay attention to continuously expanding the benefits of the project, on the other hand, we should also pay attention to continuously reducing the cost of the project. This requires that the designer should not only make the control system simple and economical, but also make the use and maintenance of the control system convenient and low cost, and should not blindly pursue automation and high indicators.
All prices listed on the official website are subject to confirmation by contact: Wu Jiedong (manager).
Our product: brand new original packaging
Our payment: 100% telegraphic transfer of inventory items before shipment, conditions can be proposed!
If you have any downtime spare parts that you cannot find, please feel free to call or use email to contact me. If there are issues that the product cannot solve, please contact me. Product prices can be negotiated. Please do not consider contacting me!
8111 gives full play to the functions of PLC and meets the control requirements of controlled objects to the maximum extent, which is the primary premise of designing PLC control system. 8111 is also the most important principle in the design. This requires designers to go deep into the site for investigation and research before design. 8111 collects the data of control site and relevant advanced domestic and foreign data. 8111 At the same time, we should pay attention to working closely with the engineering management personnel, engineering technicians and field operators on the site to formulate control plans and jointly solve key and difficult problems in the design.
Our products are guaranteed for 1 year, with new and original production stopped and imported spare parts.
All prices listed on the official website are subject to confirmation by contact: Wu Jiedong (manager).
Our product: brand new original packaging
Our warranty: All new or repaired parts have a 12 month warranty period beginning
Our payment: 100% telegraphic transfer of inventory items before shipment, conditions can be proposed!
If you have any downtime spare parts that you cannot find, please feel free to call or use email to contact me. If there are issues that the product cannot solve, please contact me. Product prices can be negotiated. Please do not consider contacting me!